Name
Morwell Tunnels

The Reinforced Earth Company was contracted by Yallourn Mine to design a coal conveyor tunnel operating under a river and a maximum of 40m of fill. As a consequence of the unsuitable foundation, a geotechnical specialist was employed to re-design the foundation taking into consideration several differing detailed footing designs.  The footings allowed for projected high levels of differential settlement and were constructed with movement joints at 12m intervals. By offering a job specific TechSpan® arch unit to cater for the unconventionally high loads, the Reinforced Earth Company allowed for varying arch thickness’ to accommodate the maximum loads sustained throughout the central length of the tunnel.

Application

Conveyor Tunnel (Mining Infrastructure)

Products

TechSpan®

Location

Latrobe Valley, VIC, Australia

Owner

Yallourn Mine

Consultant

SMEC

Contractor

Roche Thiess Linfox - Joint Venture

Construction Date

November, 2000

 

Related Projects

The Reinforced Earth Company
PO Box 1521, Hornsby Westfield NSW 1635 AUSTRALIA
p +61 2 99109910 | www.reinforcedearth.com.au
recoaustralia@reco.com.au
P O Box 72_734, Papakura, Auckland, NEW ZEALAND
p +64 9 236 3385 | www.reinforcedearth.co.nz
dap@clear.net.nz