Hazelwood Mine

The TechSpan® Arch system was used to house conveyors, with pedestrian and vehicular access, below mine vehicle access roads.  Three 24m long tunnels were erected, each in a single day, highlighting the speed and efficiency of the TechSpan® system’s construction.

Application Conveyor Tunnel (Mining Infrastructure)
Products TechSpan®
Location Morwell, VIC, Australia
Owner International Power
Contractor Hazelwood Mine
Construction Date November, 2003

 