Mt Arthur North Reclaim Tunnels

RECO was contracted to supply over 1000m of precast TechSpan® arch units to house reclaim tunnels below coal stockpiles.  Variable loads, corresponding to stockpile heights up to 25m were accounted for.  The coal was housed in cast insitu chambers containing electronically operated valves to regulate the release of coal onto the conveyor below.  Allowance for suspending the conveyor from the arch itself was also required.  An impervious membrane was installed atop each wall to seal the structure and direct all moisture away from the Reinforced Earth block and concrete headwalls were used at the tunnel entrance.

Application

Reclaim Tunnels (Mining Infrastructure) 

Products

TerraPlus©, TechSpan®

Location

Hunter Valley, NSW, Australia

Owner

BHP Billiton

Consultant

Sinclair Knight Merz

Contractor

Sinclair Knight Merz – Robert Schaefer JV

Construction Date

August, 2002

 

Related Projects

Reinforced Earth
Level 2, 20 George Street, Hornsby NSW 2077 AUSTRALIA
p +61 2 99109910 | www.reinforcedearth.com.au
recoaustralia@reco.com.au
P O Box 72_734, Papakura, Auckland, NEW ZEALAND
p +64 9 236 3385 | www.reinforcedearth.co.nz
dap@clear.net.nz